No. Under 14 CFR 120.113(b), the MRO does not delay verifying the primary result because a split specimen test is pending. If the primary result is verified positive, actions the FAA rule requires, such as notifying the Federal Air Surgeon and removal from a safety-sensitive position, are not stayed during the 72-hour request period or while the split specimen result is pending. Under 120.113(a), the employer designates or contracts for an MRO qualified under 49 CFR Part 40.
Ready to get started?